Accept a quote
Review your quote section by section and accept it at the end. The quote then becomes an order.
For: owner, admin, memberUpdated 8 Nov 2026
Where to find thisOrders > Quotes
Open Orders(opens in a new tab)Requirements
- An issued quote. Home lists it under Your turn, and you get a notification.
- The quote is still valid. It shows its last day as Valid until, and holds until the end of that day.
Steps
Open the quote from Orders > Quotes, or select Check and accept on Home. The top says Your turn: Accept quote, with the price per unit, the total, the delivery estimate and the seven steps of your order.
Select Review quote. It takes you down the Review tab to the form at the end. It does not accept anything.
Check each section on the way. The label conditions come from the rule lookup, for example the caffeine statement, with the market each applies to. Your label must carry them and you are responsible for it. The list is not complete: the general food supplement statements apply as well. The sections: Specification (quantity, format, dose per serving, serving and servings per unit, packaging, markets, who makes it, the label with its label conditions), Delivery (the factory's estimate, and when it becomes Planned and Confirmed), and Price.
Open the Documents card. Technical data sheet is a draft: it is final after procurement, and the final version comes on the order. Select Open PDF, per language. Spec sheet opens with Open PDF. You approve it on the order.
Under Price, see how the price per unit is built up: Ingredients, Packaging, Services and Fixed costs, each per unit and in total. Amounts are ex works and excl. VAT. Transport, pallets and boxes follow on a separate invoice. VAT is charged per invoice.
If you asked for other quantities, Other quantities lists each with the manufacturer's price per unit and total, or "Not priced" when it left one out.
Under Market check, read the coverage in one sentence and the notification line for each market. It belongs to your product, so Markets of this product is where you fix a gap. How we checked shows what we looked up.
Read Terms, then under Accept check the payment schedule (the deposit when the manufacturer confirms the order, the balance at QA release) and choose the country the goods go to. For a delivery to another EU country, choose how VAT is charged.
Check your Invoice address. It comes from your company details. Only an owner can change it: select Edit address, or Add address if something is missing. The change is saved to Settings > General. You cannot accept without a complete invoice address.
Under Before you accept, tick each box: the specification, the price, changes, the manufacturer's terms and payment terms (the box links to the manufacturer's terms and conditions), the Acebatch terms, and the sentence about what Acebatch looked up for your markets. Type your full name.
Select Accept quote. The button shows the price per unit you accept, and stays off until every box is ticked and your name is typed.
Result
The quote is binding and the page is now your order, on the same address. It has the tabs Overview, Price, Documents and Chat. Your name, the date and that you accepted both terms are stored with the acceptance. Your name and the date show under Price > Agreement.
The factory confirms that it can make the run. If it cannot, the order reads Declined. No payment was asked at that point.
A quote with a change
A factory can suggest a change to your specification. The quote then shows With N changes, and the card Changed by the factory lists each change with its reason. The top button reads Review quote with this change. Accepting makes the change your product's new version.
To go without the change, select Keep my version, ask for a quote without the change. The changed quote closes as Replaced by Q-….
Notes
- Questions before you accept? Ask the factory on the Chat tab.
- You accept the quote for Units in this run. To order one of the other quantities, ask the manufacturer in the chat or request a new quote at that quantity.
- An item without an amount is not in the total. You get its amount before production starts.
- An expired quote cannot be accepted. Select Request a new quote.
- To keep a copy, open the menu at the top right and select Print / save as PDF.
Related
Was this helpful?