Order status
See where every order stands, which phase it is in and in which week it is ready or delivered.
For: owner, admin, memberUpdated 30 Oct 2026
Where to find thisOrders
Open Orders(opens in a new tab)Steps
Open Orders. It is one table with three tabs: Orders for what is running, Quotes for quotes you asked for or can accept, and Closed for what is finished, declined, cancelled or expired. Each tab shows how many rows it holds.
Read a row: the product, the type, the factory, the quantity, the price per unit with the total under it, the step out of seven and who the order is waiting on. Select a column name to sort by it.
Your turn is the only amber text and names a row that waits on you, for example a payment or an approval. Late is red. A finished order reads in green with a check. Select the row to open it.
On the order, read Now under Overview: what the order waits for, and what is needed from you, if anything.
Open the Timeline and chat tab. Timeline shows five steps: done, now, or not started yet, with the date each one started.
Tabs
An order has three tabs. The tab shows in the address, so a link opens the tab it names.
- Overview: Now, the delivery week, what is yours to do (payment, spec sheet, label artwork, delivery), your invoice details, delivery and your contact. An amber dot on the tab means something is yours to do. The other tabs then show a line that takes you back to it.
- Documents: the documents of the order, the certificate of analysis, your invoices, the quote lines and what was checked for your markets. The number is how many documents there are.
- Timeline and chat: the timeline, the chat with your manufacturer and Activity. The number is the messages you have not read yet.
A quote that is not accepted yet has no tabs.
Before production
Until production is cleared, the order shows one of three states.
- Waiting for factory confirmation: the factory checks that it can make the run.
- Accepted, awaiting your deposit: pay the deposit.
- Cleared for production: the factory starts with the first phase.
Steps
Every order moves through five steps: Quote accepted, Procurement, Production, QA, and Shipping & Delivery. Until procurement starts, the order stays at Quote accepted: the factory confirms the run, you pay and you approve the spec sheet. You get a notification when the order enters a new phase.
Under Documents (the tab), the certificate of analysis of the finished batch shows Not yet until the factory adds it after QA release.
If the factory moves an order back a phase, the order says to which phase, on which day and why.
Weeks
Once the factory confirms your order, the row and the order show a week with how sure it is:
- Estimate: a range, such as week 44 to 46. It counts from the day your deposit arrives, or from today before that, and from when the materials are in if that is later.
- Planned: one week. Every material has an arrival date and production has a slot. If a material comes in short or without its certificate, the week goes back to an Estimate until it is sorted, never earlier than the production slot.
- Confirmed: one week. QA released the batch. It reads delivery week once the factory has set the shipping date.
If the week moves later than the one you were told, you get one notification with the new week and the reason. An earlier week updates without a notification.
Result
A shipped order moves to the Closed tab of Orders. Its documents stay on the product page.